Get a Free Quote!

Nieves & Baker Roofing, LLC

Nieves & Baker Roofing, LLCNieves & Baker Roofing, LLCNieves & Baker Roofing, LLC

Nieves & Baker Roofing, LLC

Nieves & Baker Roofing, LLCNieves & Baker Roofing, LLCNieves & Baker Roofing, LLC
  • Home
  • Contact Us
  • Services
  • About Us
  • Gallery
  • Step by Step
    • Home
    • Contact Us
    • Services
    • About Us
    • Gallery
    • Step by Step
  • Home
  • Contact Us
  • Services
  • About Us
  • Gallery
  • Step by Step

our steps for you

Our First Step

Our Second Step

Our Second Step

image682

To begin our project, we do a walk around the property to inspect any existing damage  including but not limited to Windows, screened Porch, Driveway. Etc.. We then take pictures and inform the Home owner of our discoveries. 

Our Second Step

Our Second Step

Our Second Step

image683

We proceed to cover the driveway with a tarp. We also cover the perimeter of the property  to assure there aren't any damages during the project.

Third Step

Our Second Step

Fourth Step

image684

We begin the "Tear- Off" process up until the plywood is visible. We inspect the plywood to assure it meets building codes, if the plywood does not in fact meet codes, we must then replace the damaged sheets. 

Fourth Step

Fourth Step

Fourth Step

image685

We begin Re-nailing the Roof with 2-3 x 8 (Ring Bright MDP) Framing nails if required

to bring it up to Code. 

Fifth Step

Fourth Step

Sixth Step

image686

We add self adhering membrane to all valleys  (Valleys are the most water vulnerable places on the roof ! ) 

Sixth Step

Fourth Step

Sixth Step

image687

We continue by covering the roof with a synthetic roof underlayment attached with 1" cap nails.

Seventh Step

Seventh Step

Seventh Step

image688

We then proceed to drip edge the Home ONLY if the home does not have Gutters. If the property has Gutters, We shall not remove the existing drip edge.

Eighth Step

Seventh Step

Seventh Step

image689

We Begin The Shingle Process. Every shingle is installed with six

 1-1/4" coil nails. 

Ninth Step

Seventh Step

Eleventh Step

image690

We Begin by applying a 6 inch wide coat of Bull (Roofing Cement) along the perimeter.

Eleventh Step

Eleventh Step

Eleventh Step

image691

We Install The Shingle Cap and Shingle Vents per Manufacturer Specifications  


Twelfth Step

Thirteenth Step

Thirteenth Step

image692

We clean  the roof and gutters to finalize the Project. 

Thirteenth Step

Thirteenth Step

Thirteenth Step

image693

As well as assuring the perimeter of the home is cleared as well, Our Workers use magnets around the property to pick up loose nails.

Fourteenth Step

Fourteenth Step

Fourteenth Step

image694

 Finally we do a final walk through with the Home Owner around the property to assure the job was done correctly and if any imperfection is found it shall be addressed before departure.

Final Step

Fourteenth Step

Fourteenth Step

image695

We then Grant you with a certificate of Completion !

Our Mission

Here at Nieves & Baker Roofing LLC we want to provide our Home Owners with the most reliable and Safest work possible. 

See Our Projects

Copyright © 2019 nbroof - All Rights Reserved.

  • Gallery

Powered by GoDaddy Website Builder